Ukrhidroenergobud
All news

10/1/2020

INSTALLING OF THE GENERATOR STATOR

INSTALLING OF THE GENERATOR STATOR

October 2020. At the Dniester PSPP, the stator of the generator of the hydraulic unit № 4 was moved to the design position. The construction readiness of the mine was provided by the Consortium RPA Ukrgidroenergobud - the general contractor for the construction of the Dniester PSPP.

October 2020. At the Dniester PSPP, the stator of the generator of the hydraulic unit № 4 was moved to the design position. The construction readiness of the mine was provided by the Consortium RPA Ukrgidroenergobud - the general contractor for the construction of the Dniester PSPP.